Power Management & Load Control
Generator load sharing, priority-based load shedding, automatic load restoration, and demand control.

- System Architecture
- Redundant PLC
- Response Time
- < 50 ms Fast Contingency Load Shedding
- Communication
- IEC 61850, Modbus TCP/IP, Ethernet/IP, Profinet
- Priority Levels
- Up to 16 configurable priority shedding matrices
Industrial Power Management & Automated Load Control
PT Multi Daya Mitra implements intelligent Power Management Systems (PMS) that safeguard islanded or grid-connected power networks from total blackouts during unexpected generation losses or sudden peak overloads.
Generator Load Sharing & Demand Management
Optimizes fuel economy and engine operating hours by distributing plant electrical load proportionally across running generators, with automatic peak shaving during high tariff periods.
Priority-Based Load Shedding & Sequential Restoration
When generating capacity drops, high-speed contingency algorithms instantly shed non-critical feeders within milliseconds to preserve frequency and voltage stability for essential production processes, sequentially reconnecting loads once power reserves recover.
Interested in this product?
Contact our technical sales team for pricing, availability, and engineering integration support.